|
|
|
|
LEADER |
00000nam a22000007a 4500 |
001 |
75368 |
003 |
KOHA |
005 |
20230227124254.0 |
008 |
220421b tu ||||| |||| 00| 0 eng d |
040 |
|
|
|a TR-AnSBB
|b eng
|c TR-AnSBB
|
041 |
|
|
|a eng
|
082 |
|
|
|a 352.48 ROBc
|
100 |
|
|
|a Robinson, Marc
|
245 |
1 |
0 |
|a Program classification for performance-based budgeting:
|b how to structure budgets to enable the use of evidence /
|c Marc Robinson
|
260 |
|
|
|a Washington, D.C.:
|b Independent Evaluation Group; World Bank,
|c 2013
|
300 |
|
|
|a 54 p. : ill.
|
490 |
0 |
|
|a IEG Evaluation Capacity Development Series
|
504 |
|
|
|a Includes bibliographical references (p. 54)
|
650 |
0 |
0 |
|a Budget
|x Classification
|
650 |
0 |
0 |
|a Bütçe
|x Sınıflandırma
|
710 |
|
|
|a Independent Evaluation Group (IEG)
|
710 |
|
|
|a The World Bank
|
710 |
|
|
|a International Bank for Reconstruction and Development (IBRD)
|
942 |
|
|
|2 ddc
|c BK
|
952 |
|
|
|0 0
|1 0
|2 ddc
|4 0
|6 352_480000000000000_ROBC
|7 0
|9 134550
|a SBB
|b SBB
|c Kütüphane
|d 2022-04-21
|e BAGIS
|l 0
|o 352.48 ROBc
|p 0049262
|r 2022-04-21 00:00:00
|w 2022-04-21
|y BK
|
999 |
|
|
|c 75368
|d 75368
|