APA (7. basım) Alıntı

Sivas Demir ve Çelik Tesisleri. (1979). A Feasibility study for the establishment of an iron and steel plant at Sivas - Körtuzla for a capacity of 2 400 000 ton per year long products: ( Revised from November , 1978 dated report ). Sivas Demir ve Çelik Tesisleri.

Chicago Style (17. basım) Atıf

Sivas Demir ve Çelik Tesisleri. A Feasibility Study for the Establishment of an Iron and Steel Plant at Sivas - Körtuzla for a Capacity of 2 400 000 Ton Per Year Long Products: ( Revised from November , 1978 Dated Report ). Ankara: Sivas Demir ve Çelik Tesisleri, 1979.

MLA (9th ed.) Atıf

Sivas Demir ve Çelik Tesisleri. A Feasibility Study for the Establishment of an Iron and Steel Plant at Sivas - Körtuzla for a Capacity of 2 400 000 Ton Per Year Long Products: ( Revised from November , 1978 Dated Report ). Sivas Demir ve Çelik Tesisleri, 1979.

Uyarı: Bu alıntı herzaman %100 doğru olmayabilir..