|
|
|
|
LEADER |
00000cam a2200000 4500 |
001 |
63320 |
003 |
KOHA_MIRAKIL |
008 |
141211n 000 0 eng u |
040 |
|
|
|a TR-AnSBB
|b tur
|c TR-AnSBB
|
090 |
|
|
|a 3.30.2.3.9/3 KOS
|
100 |
|
|
|a Kostic, Evgehije P.
|
245 |
|
|
|a Zamantı river zinc - lead project /
|c Evgehije P. Kostic.
|
260 |
|
|
|a Ankara:
|b DPT. İPD.,
|c 1968.
|
300 |
|
|
|a 15 y.
|
440 |
|
|
|a DPT Yayın no: 557 - İPD: 220
|
440 |
|
|
|a DPT Yayın no: 691 - İPD: 244
|
500 |
|
|
|a "Memorandum:" This Report has not been cleared with the United Nations Industrial Development Organization which does not tharefore necessarily share the view expressed."
|
710 |
|
|
|a T.C. Başbakanlık Devlet Planlama Teşkilatı. İktisadi Planlama Dairesi. (DPT. İPD)
|
942 |
|
|
|2 ddc
|c BK
|
952 |
|
|
|0 0
|1 0
|2 ddc
|4 0
|6 3_300000000000000_2_3_9_3_KOS
|7 0
|9 100544
|a SBB
|b SBB
|c Kütüphane
|d 2014-12-11
|e DPT
|o 3.30.2.3.9/3 KOS
|p 0044168
|r 2021-05-05 00:00:00
|w 2014-12-11
|y BK
|
999 |
|
|
|c 63320
|d 63320
|