Keban dam and hydroelectric power plant; Report on cost estimate construction planning and construction equipment.
Müşterek Yazar: | Ebasco Services Incorporated |
---|---|
Materyal Türü: | Kitap |
Baskı/Yayın Bilgisi: |
New York
October 1964.
|
Benzer Materyaller
- Oymapınar Dam and hydroelectric project; second phase/ prepared by Coyne and Beller with the colloboration of SOGEI and in cooperation with Aknil T. Elektrik İşleri Etüd İdaresi, 1969-70.
-
Report to the Government on the Instittute for Plant Protection Chemicals and Equipment.
Yazar:: Hopp, H S
Baskı/Yayın Bilgisi: (1959) -
Fossil fuel-fired power generation: case studies of recently constructed coal-and gas-fired power plants: in support of the G8 plan of action (Colin Henderson).
Yazar:: Henderson, Colin
Baskı/Yayın Bilgisi: (2007) - Engineering and construction world.
-
Report on model construction 28 - 31 March, 1966.
Yazar:: Sandee, J.