Keban dam and hydroelectric power plant; Report on cost estimate construction planning and construction equipment.
Corporate Author: | Ebasco Services Incorporated |
---|---|
Format: | Book |
Published: |
New York
October 1964.
|
Similar Items
- Oymapınar Dam and hydroelectric project; second phase/ prepared by Coyne and Beller with the colloboration of SOGEI and in cooperation with Aknil T. Elektrik İşleri Etüd İdaresi, 1969-70.
-
Report to the Government on the Instittute for Plant Protection Chemicals and Equipment.
by: Hopp, H S
Published: (1959) -
Fossil fuel-fired power generation: case studies of recently constructed coal-and gas-fired power plants: in support of the G8 plan of action (Colin Henderson).
by: Henderson, Colin
Published: (2007) - Engineering and construction world.
-
Report on model construction 28 - 31 March, 1966.
by: Sandee, J.