Preliminary Report on the Updating of the Bosphorus Bridge and Connecting Highways Feasibility Study.
Corporate Author: | De Leuw, Cather International inc |
---|---|
Format: | Book |
Published: |
Chicago:
June 1968.
|
Subjects: |
Similar Items
-
The finance of the Bosphorus Bridge.
by: Uras, Güngör
Published: (1973) -
Updating of the Bosphorus Bridge and Connecting Highways Feasibility Study.
Published: (1968) - Feasibility study for a second Bosporus crossing
-
Yatılı bölge okulları.
by: Can, Tulgar
Published: (1965) -
Wakuti Firmasının hidro - elektrik enerji tesisleri konusundaki teklifleri [ve] hakkında not.
Published: (1970)