Planlama ve programlama tekniğinde yeni metodlar PERT (Project Evaluation and Review Technique) ve CPM (Critical Path Method).

Bibliographic Details
Main Author: Aras, Reştan M.
Format: Book
Published: Remington Rant
Subjects:

MARC

LEADER 00000cam a2200000 4500
001 59418
003 KOHA_MIRAKIL
008 121203s turf 00010 tur
040 |a TR-AnSBB  |b tur  |c TR-AnSBB 
090 |a 3.13.1/ARA 
100 |a Aras, Reştan M. 
245 |a Planlama ve programlama tekniğinde yeni metodlar PERT (Project Evaluation and Review Technique) ve CPM (Critical Path Method). 
260 |a Remington Rant 
300 |a 19 s. :  |b şek. tek. 
650 |a Proje ve projecilik 
650 |a Proje değerlendirilmesi 
650 |a PERT 
650 |a CPM 
942 |2 ddc  |c BK 
952 |0 0  |1 0  |2 ddc  |4 0  |6 3_130000000000000_1_ARA_K  |7 0  |9 94974  |a SBB  |b SBB  |c Kütüphane  |d 2012-12-03  |e BAGIS  |o 3.13.1/ARA K  |p 0039184  |r 2012-12-03 00:00:00  |w 2012-12-03  |y BK 
999 |c 59418  |d 59418