A model for long term labor supply functions in manufacturing industry

Bibliographic Details
Main Author: Akyüz, Nuran
Corporate Author: T. C. Başbakanlık Devlet Planlama Teşkilatı. İktisadi Planlama Dairesi (DPT. İPD)
Format: Book
Published: Ankara: DPT. İPD, February 1971
Series:DPT. 993 - İPD. 306
Subjects:

MARC

LEADER 00000cam a2200000 4500
001 58839
003 KOHA_MIRAKIL
008 121012s1971 engf 00010 eng
040 |a TR-AnSBB  |b tur  |c TR-AnSBB 
050 |a 331.6:338.45/A49 
100 |a Akyüz, Nuran 
245 |a A model for long term labor supply functions in manufacturing industry 
260 |a Ankara:  |b DPT. İPD,  |c February 1971 
300 |a 56 y. ek. tab. teksir 
440 |a DPT. 993 - İPD. 306 
504 |a Bibl.: y. 52-56 
650 |a İşgücü, İmalat sanayii  |x A.B.D 
650 |a İşgücü, İmalat sanayii 
710 |a T. C. Başbakanlık Devlet Planlama Teşkilatı. İktisadi Planlama Dairesi (DPT. İPD) 
942 |2 ddc  |c BK 
952 |0 0  |1 0  |2 ddc  |4 0  |6 331_000000000000000_6338_45_A49_N_1  |7 0  |9 94216  |a SBB  |b SBB  |c Kütüphane  |d 2012-10-12  |e DPT  |o 331.6:338.45 A49 N.1  |p 0037571  |r 2012-10-12 00:00:00  |w 2012-10-12  |y BK 
952 |0 0  |1 0  |2 ddc  |4 0  |6 331_000000000000000_6338_45_A49_N_2  |7 0  |9 94217  |a SBB  |b SBB  |c Kütüphane  |d 2012-10-12  |e DPT  |o 331.6:338.45 A49 N.2  |p 0037572  |r 2012-10-12 00:00:00  |w 2012-10-12  |y BK 
999 |c 58839  |d 58839