Critical path analysis by bar chart; the new role of job progress charts. 2nd ed.
Main Author: | Lowe, C W |
---|---|
Format: | Book |
Published: |
London,
Business Books,
1969.
|
Subjects: |
Similar Items
-
Critical path analysis; problems and solutions.
by: Lockyer, K G
Published: (1966) -
Critical path methods in construction practice. By James M. Antill and Ronald W. Woodhead.
by: Antill, James M
Published: (1965) -
Project management with CPM and PERT. 2nd ed. By joseph J. Moder and Cecil R. Phillips.
by: Moder, Joseph J
Published: (1970) -
Kritik yol analizi.
by: Gage, William Lionel
Published: (1970) -
Network analysis for planning and scheduling. 3rd ed.
by: Battersby, Albert
Published: (1970)