Projected costs of generating electricity: 2005 update / Nuclear Energy Agency, International Energy Agency, Organisation for Economic Co-operation and Development.

Bibliographic Details
Corporate Authors: OECD Nuclear Energy Agency (NEA), Organisation for Economic Co-operation and Development (OECD)
Format: Book
Published: Paris: OECD/IEA, 2005.
Subjects:
Online Access:E-ERİŞİM

MARC

LEADER 00000cam a2200000 4500
001 53364
003 KOHA_MIRAKIL
008 100903s2005 usaf 00010 tur
020 |a 9264008268 
040 |a TR-AnSBB  |b tur  |c TR-AnSBB 
082 |a 333.79323/PRO 
245 |a Projected costs of generating electricity: 2005 update / Nuclear Energy Agency, International Energy Agency, Organisation for Economic Co-operation and Development. 
260 |a Paris:  |b OECD/IEA,  |c 2005. 
300 |a 230 p. :  |b charts, col. 
504 |a Includes bibliographical references. 
650 |a Coal-fired power plants  |x Costs  |x Forecasting 
650 |a Kömür yakan enerji santralleri  |x Maliyetler  |x Tahmin 
650 |a Nuclear power plants  |x Costs  |x Forecasting 
650 |a Nükleer santraller  |x Maliyetler  |x Tahmin 
650 |a Electric utilities  |x Costs  |x Forecasting 
650 |a Elektrik hizmet kurumları  |x Maliyetler  |x Tahmin 
710 |a OECD Nuclear Energy Agency (NEA) 
710 |a Organisation for Economic Co-operation and Development (OECD) 
856 |3 E-ERİŞİM  |u http://www.sourceoecd.org/9264008268 
942 |2 ddc  |c BK 
952 |0 0  |1 0  |2 ddc  |4 0  |6 333_793230000000000_PRO_K  |7 0  |9 86016  |a SBB  |b SBB  |c Kütüphane  |d 2010-09-03  |e BAGIS  |o 333.79323 PRO K  |p 0031260  |r 2010-09-03 00:00:00  |w 2010-09-03  |y BK 
999 |c 53364  |d 53364